Making Diamond Segment

Making Diamond Segment

Tubular Mixing Machine For Diamond Powder Drum Mixer BWM_TB10
Tubular Mixing Machine For Diamond Powder Drum Mixer BWM_TB10
Tubular Mixing Machine For Diamond Powder Drum Mixer BWM_TB10

Tubular Mixing Machine For Diamond Powder Drum Mixer BWM_TB10

Product Specification:
  • Model :
    BWM-TB10
  • Volume :
    10/L
  • Power :
    0.6KVA
  • Weight :
    about 60kg
  • Rotation speed :
    8-60rpm
  • Electric :
    AC220V Single phase
  • Size :
    L800mm*W700mm*H850mm
See Price
  1. Product Details

Tubular Mixing Machine for diamond powder Drum Mixer BWM-TB10

This tubulai mixer is to mix metal powders and diamond power with three-dimensional moving behaviors in order to mix, cut powders very hompgeneously. Spinning speed and mixing time can be adjusted.

 
Tubular Mixing Machine for diamond powder Drum Mixer
Parameter
Type: BWM-TB10
Power: 0.6KVA
Electric: AC220V Single phase
Rotation speed 8-60rpm
Volume: 10/L
Machine Size: Lenght 800mm   
Width  700mm 
Height 850mm
Weight: about 60kg
Other specifications can be customized according to buyer's requirements.
 
Tubular Mixing Machine for diamond powder Drum Mixer  BWM-TB10

Tubular Mixing Machine for diamond powder Drum Mixer

Tubular Mixing Machine for diamond powder Drum Mixer 01


Tubular Mixing Machine Drum Mixer
 packing in the wooden.
We can also pack the counting machine according to buyer's requirements.
Special specifications need to be negotiated with us before the delivery date.
 
Fujian Nan'an Boreway Machinery Co.,Ltd.
ADD: HuaHui Center, Shuitou Town,Quanzhou, Fujian, China, 
Post Code: 362342 
Tel.: 0086-595-86990206 
Fax: 0086-595-86990220 
Mobile/WhatsApp: +86 18650679939 
Wechat: +86 18650679939 
Skype: boreway01 
E-mail: [email protected]
  
Write us

Maecenas malesuada elit lectus felis, malesuada ultricies. Curabitur et ligula. Ut molesie a, ultricies porta urna.Maecenas malesuada elit lectus felis, malesuada ultricies. Curabitur et ligula. Ut molesie a, ultricies porta urna.

>> Drag slider validation